Kitchen renovation in Edinburgh

Layout, units, services and the order work needs to happen in

The short answer

A kitchen renovation usually means new units, worktops, appliances and flooring, and often moving plumbing or electrics. Most kitchens don't need planning permission or a building warrant unless you're knocking through a wall, moving a gas flue, or the property is listed. Costs vary hugely with unit quality, worktop material and how much of the existing layout is kept, from a straightforward refit to a full strip-out with structural changes.

What is different in Edinburgh

  • In Edinburgh's New Town and Old Town conservation areas, any new external extractor vent or flue on a front elevation is likely to need listed building consent even where the kitchen work itself does not.
  • Tenement kitchens often sit above a neighbour's ceiling, so moving heavy stone worktops or repositioning plumbing can require notifying, or getting consent from, the flat below under the tenement's title deeds.
  • Older Victorian and Edwardian kitchens in Edinburgh sometimes have shared or historic drainage runs; a plumber may need to trace these before agreeing a new layout.
  • In West Lothian's newer housing estates, kitchens are more likely to be single-storey extensions with straightforward access, which usually keeps disruption and scaffolding costs lower.

What the project involves

A kitchen renovation ranges from swapping doors and worktops on an existing carcass layout, through to a full strip-out that repositions the sink, hob and appliances and involves new plumbing, electrics and sometimes gas work.

Bigger jobs often coincide with removing a wall to open the kitchen into a dining room or hallway, which brings in structural work as well as finishes.

Consents and regulations in Scotland

A like-for-like refit within the existing footprint generally needs no permission. Moving gas appliances requires a Gas Safe registered engineer; new circuits or a consumer unit change need to meet building regulations and are usually certified by a registered electrician (SELV/BS 7671 compliant work).

If the renovation includes removing or altering a structural wall, or the property is listed or in a conservation area and the work affects the external appearance (a new external flue or extractor vent, for example), a building warrant and/or listed building consent may be needed from the local council before work starts.

Sequencing

Strip-out first, then any structural or first-fix plumbing and electrical work, then plastering, flooring, unit installation, worktop templating and fitting, then appliance connection and final electrical/gas certification.

What commonly goes wrong

Underestimating lead times for made-to-measure worktops (stone worktops in particular can take several weeks after templating), ordering units before final measurements are confirmed, and not agreeing early who supplies which fittings, which causes delays when trades arrive to find items missing.

What it usually costs

Indicative ranges only, to help you judge a quote. They are not an estimate for your property — only the business doing the work can give you that.

  • Like-for-like refit with mid-range units: driven mainly by carcass quality, door style and number of units.
  • Worktops: laminate is the lowest cost option; quartz and granite cost significantly more and need templating time.
  • Moving plumbing or electrics: adds cost for pipework, chasing walls and certification, more so in tenement flats with concealed original pipework.
  • Structural openings: adds a structural engineer's fee, steel beam cost and building warrant fee on top of the kitchen fit-out.
  • Appliances: integrated appliances cost more than freestanding but suit fitted layouts better.

What to do, in order

  1. 1Agree the layout and check whether any wall is structural before finalising the design.
  2. 2Get a building warrant if structural work or an external flue/vent change is involved.
  3. 3Arrange first-fix plumbing and electrics before plastering.
  4. 4Fit flooring before or after units depending on the chosen sequence with your fitter.
  5. 5Have worktops templated once units are installed, then fitted a week or two later.
  6. 6Complete final electrical and gas certification before appliances are used.

When you need a professional

A structural engineer should assess any wall being removed or altered, and a City of Edinburgh Council building standards officer (or the relevant Lothian council) can confirm whether a warrant is needed before work starts.

Common questions

How long does a full kitchen renovation take?
A straightforward refit can take one to two weeks; a full renovation with structural changes and made-to-order worktops commonly takes four to eight weeks from strip-out to completion.
What does kitchen renovation cost in Edinburgh?
Edinburgh labour rates sit above the Scottish average, and access is the other cost driver: tenement stair access, scaffolding on a busy street and parking permits all add to a quote. Get three written quotes for the same specification before comparing prices.
How do I find a reliable business for kitchen renovation in Edinburgh?
Check the business is trading locally, ask for recent Edinburgh addresses you can look at, confirm public liability insurance and any trade registration, and get the quote in writing. Lothian Property lists independent local businesses and passes your enquiry on with your permission — we do not carry out the work ourselves.

Step 1 of 3

Planning a kitchen renovation?

Tell us about your kitchen project and we'll introduce you to relevant local professionals to speak to.

What do you need?

Lothian Property is a property information and professional-introduction service operated by Maybury Scotland Limited. Lothian Property is not an estate agency. Where requested, we may connect homeowners with independent estate agents and other property professionals. How we work.

Related pages

  • Bathroom renovation

    Refitting a bathroom or en suite, from replacing a suite to reworking waste, ventilation and waterproofing.

Last reviewed 18 August 2026.