Home improvements · Edinburgh
Bathroom renovation in Edinburgh
Suites, waterproofing, ventilation and drainage done properly
The short answer
A bathroom renovation typically covers a new suite, tiling, waterproofing and ventilation, and sometimes repositioning the toilet or shower, which affects drainage falls. Most bathroom work doesn't need planning permission, though building regulations cover ventilation, electrics near water, and drainage. Costs are driven mainly by tile and sanitaryware quality, whether pipework moves, and access, particularly in upper-floor tenement flats.
What is different in Edinburgh
- Many Edinburgh tenement bathrooms were originally converted from box rooms, so waste pipe routes can be long and awkward, which affects both cost and how much reconfiguration is realistic.
- In listed New Town properties, replacing an original cast-iron bath or period fittings may be a consideration for owners concerned about character, even though it is not usually a consent issue in itself.
- Coastal East Lothian properties can see faster corrosion of bathroom extractor fan housings and fixings, so more durable external ventilation terminals are often worth specifying.
- New-build homes across West Lothian tend to have more standardised bathroom pipework, which usually makes reconfiguration straightforward compared with older stock.
What the project involves
Work ranges from replacing a bath, toilet and basin like-for-like, to a full renovation with a new shower enclosure, underfloor heating, tiling and mechanical ventilation.
Wet rooms and walk-in showers need careful waterproofing (tanking) and a properly falled floor to drain water correctly, which is more involved than a standard shower tray installation.
Consents and regulations in Scotland
Building regulations govern electrical work in bathroom zones (only specific fittings are permitted near water), mechanical extraction rates, and waste pipe requirements. Most straightforward refits don't need a building warrant, but repositioning drainage substantially, or adding a bathroom where none existed, can trigger one.
In a tenement, altering shared soil stacks or drainage that other flats connect to usually needs coordination with, or consent from, neighbouring owners.
Sequencing
Strip-out, first-fix plumbing and electrics, waterproofing/tanking where relevant, tiling, sanitaryware installation, then final electrical and plumbing testing.
What commonly goes wrong
Poor waterproofing beneath tiling leading to leaks into the room or flat below, extraction fans that don't meet the required air-change rate, and underestimating how long tile adhesive and grout need to cure before a shower is used.
What it usually costs
Indicative ranges only, to help you judge a quote. They are not an estimate for your property — only the business doing the work can give you that.
- Like-for-like suite replacement: driven by sanitaryware and tile choice rather than labour complexity.
- Wet room conversion: adds cost for tanking, floor build-up and a falled drainage outlet.
- Moving the toilet or shower position: adds plumbing and sometimes floor joist work to route new waste pipework.
- Underfloor heating: a moderate addition to cost but affects floor build-up height, relevant in older flats with limited headroom.
- Extraction and electrics: adds a modest but necessary cost to meet building regulations in the bathroom zone.
What to do, in order
- 1Decide whether the layout is changing or being kept the same, since this affects plumbing complexity.
- 2Check whether waste pipe or soil stack changes need neighbour coordination in a tenement.
- 3Complete first-fix plumbing and electrics before any tiling begins.
- 4Tank wet areas thoroughly and allow proper curing time before tiling.
- 5Fit sanitaryware and test for leaks before final decoration.
- 6Get electrical work near water certified by a registered electrician.
When you need a professional
A Gas Safe registered engineer is needed for any gas combi-boiler work in an en suite cupboard, and a plumber experienced in tenement drainage should assess any shared soil stack changes.
Common questions
- How long does a bathroom renovation take?
- A like-for-like refit typically takes one to two weeks; a full renovation with tanking and tiling commonly takes two to four weeks.
- What does bathroom renovation cost in Edinburgh?
- Edinburgh labour rates sit above the Scottish average, and access is the other cost driver: tenement stair access, scaffolding on a busy street and parking permits all add to a quote. Get three written quotes for the same specification before comparing prices.
- How do I find a reliable business for bathroom renovation in Edinburgh?
- Check the business is trading locally, ask for recent Edinburgh addresses you can look at, confirm public liability insurance and any trade registration, and get the quote in writing. Lothian Property lists independent local businesses and passes your enquiry on with your permission — we do not carry out the work ourselves.
Lothian Property is a property information and professional-introduction service operated by Maybury Scotland Limited. Lothian Property is not an estate agency. Where requested, we may connect homeowners with independent estate agents and other property professionals. How we work.
Related pages
- Kitchen renovation
Replanning layout, units, worktops and services in the room most homes are refitted around.
- Loft conversion
Turning roof space into usable rooms, from a simple rooflight loft to a full dormer conversion.
Last reviewed 18 August 2026.